Located in Dilovası, Kocaeli, EAE DL-4 Factory achieved LEED Silver certification with 50/110 points through the LEED certification process managed by ERKE. The 59,302 m² industrial manufacturing facility was assessed under LEED v4 BD+C: New Construction, covering energy performance, water efficiency, sustainable sites, materials, indoor environmental quality and innovation. We managed the certification strategy in line with the facility’s operational requirements, industrial use profile and project priorities, completing certification on August 19, 2026. With this achievement, we added another major LEED-certified industrial building in Kocaeli to ERKE’s sustainable building portfolio.

Project Overview

  • Rating system: LEED v4 BD+C: New Construction
  • Certification level: LEED Silver
  • Score: 50/110
  • Certification date: August 19, 2026
  • Gross floor area: 59,302 m²
  • Location: Dilovası, Kocaeli, Türkiye
  • Project owner: EAE Elektrik A.Ş.
  • Official website: EAE
  • USGBC Project Link: EAE DL-4 FACTORY

Scorecard Summary

Location and Transportation (LT) – 5/16

We optimized the transportation and site strategy according to the project’s industrial location, securing points through Sensitive Land Protection, Surrounding Density and Diverse Uses, Reduced Parking Footprint and Green Vehicles. ERKE structured this category at the optimum level for the facility’s operational needs, site conditions and project objectives.

Sustainable Sites (SS) – 6/10

We achieved 6/10 points in Sustainable Sites by integrating effective stormwater and heat-island strategies into the project. Rainwater Management achieved 3/3 points, while Heat Island Reduction achieved 2/2 points, supported by our coordinated approach to site assessment and environmental impact management.

Water Efficiency (WE) – 8/11

Water efficiency became one of the strongest performance areas of the project, with 8/11 points achieved. We delivered 6/6 points for Indoor Water Use Reduction, supported by a documented 79.51% reduction in indoor water use, while also coordinating outdoor water reduction and water metering strategies to improve long-term resource management.

Energy and Atmosphere (EA) – 12/33

Through our whole-building energy modelling and engineering optimization, we demonstrated 25.2% energy cost savings against ASHRAE 90.1-2010 Appendix G, securing 10/18 points for Optimize Energy Performance. Together with Advanced Energy Metering and Enhanced Refrigerant Management, we delivered 12/33 points and developed an energy strategy optimized for the operational realities of a large-scale manufacturing facility.

Materials and Resources (MR) – 4/13

We managed material selection and documentation with a focus on environmental product declarations, responsible sourcing and construction waste management, achieving 4/13 points. In particular, we secured the full 2/2 points for Construction and Demolition Waste Management, strengthening resource efficiency throughout the construction process.

Indoor Environmental Quality (IEQ) – 6/16

For indoor environmental quality, we achieved 2/2 points for Enhanced IAQ Strategies, 2/3 points for Low-Emitting Materials and 2/2 points for Interior Lighting. Our engineering coordination focused on creating healthier indoor conditions while aligning air quality, material emissions and lighting requirements with the operational needs of the facility.

Innovation (IN) – 5/6

Innovation was another high-performing category, with 5/6 points achieved. We secured 4/5 points under Innovation together with 1/1 point for LEED Accredited Professional, reflecting the value of an experienced LEED management team and a certification strategy tailored specifically to the project.

Regional Priority (RP) – 3/4

We achieved 3/4 Regional Priority points through Reduced Parking Footprint, Rainwater Management and Heat Island Reduction. These credits allowed us to integrate sustainability measures that directly address regional environmental priorities into the overall LEED strategy.

Integrative Process (IP) – 1/1

We secured the full 1/1 point for Integrative Process by incorporating sustainability considerations into coordinated design and engineering decisions. This approach enabled energy, water and operational requirements to be evaluated together rather than as isolated certification topics.

Technical Information

EAE DL-4 Factory is a 59,302 m² industrial manufacturing facility certified under LEED v4 BD+C: New Construction. ERKE managed the certification process to completion, achieving 50/110 points and LEED Silver certification.

What Is LEED?

LEED, developed by the U.S. Green Building Council, is an internationally recognized green building certification system that evaluates buildings across areas such as energy, water, materials, site sustainability and occupant well-being. The BD+C rating system is designed for new construction and major renovation projects. In LEED-certified industrial building projects, integrating sustainability objectives into engineering decisions from the early design stages is critical. Learn more about our approach on our LEED Certification and Consultancy page.

ERKE’s Role

With our engineering expertise developed since 1995, we customize the Preliminary Assessment → Strategy → Certification process according to each building type, operational model and sustainability target.

  • Green Building Consultancy and Certification Strategy: We identified achievable credits during preliminary assessment and converted the LEED Silver target into a technically feasible certification roadmap aligned with the project’s constraints and priorities.
  • Sustainable Building Analysis & CFD: We used energy modelling and performance analyses to optimize building performance and support sustainability decisions with measurable engineering data.
  • Sustainable Materials Consultancy: We coordinated environmental product declarations, responsible sourcing requirements and low-emitting material documentation throughout the certification process.
  • Testing and Commissioning with System Safety Coordination: We managed fundamental commissioning requirements, energy metering and the alignment of building systems with LEED criteria throughout project delivery.

Sectoral and Environmental Contribution

For industrial facilities, sustainability creates measurable value when high-consumption operations are managed with greater efficiency. At EAE DL-4 Factory, we addressed water reduction, energy performance, rainwater management, heat island mitigation and indoor environmental quality within one coordinated certification framework. As a LEED-certified industrial facility in Kocaeli, the project demonstrates how environmental performance and manufacturing requirements can be successfully integrated without disconnecting sustainability targets from operational reality.

Conclusion

We guided EAE DL-4 Factory to LEED Silver certification with 50/110 points through an optimized strategy shaped around the facility’s scale, industrial functions and project objectives. At ERKE, we combine technical analysis, documentation and certification management within a single engineering framework. To achieve similar sustainability results in your projects, contact us.